Point calculation logic examples for Tiered campaigns

This document gives examples of all three options that can be chosen to calculate awarded points when using the Tiered campaign module. These are:

Amount-based

The customer receives the points for each amount they reach within the tier.

The first table shows how the multiplication rules change when progressing within the tier system. The second table shows the actualization of the points being awarded based on these rules.

Example:

Given property

Increment

Tier 1

0-50

10

Tier 2

51-100

20

Tier 3

101-200

30

 

<Property>
before grace period

Pending point preview before grace period

Bracketed

<Property> at the end of the campaign

Awarded points

Bracketed

A user

49

490

490

79

1,580

500+580

B user

70

1,400

500+400 =900

90

1,800

500+800

C user

154

4,620

500+1000+1620=3120

300

6,000

500+1000+3000

Hit limit-based

Once the customer reaches the tier, they get the points one time.

The first table shows the number of points to be awarded when entering a new tier. The second table shows the actualization of the points being awarded based on these rules.

Example:

Given property

Points for hit limit

Tier 1

0-50

10

Tier 2

51-100

20

Tier 3

101-200

30

 

<Property>
before grace period

Pending point preview before grace period

Bracketed

<Property> at the end of the campaign

Awarded points

Bracketed

Advisor A

49

0

0

79

10

10

Advisor B

70

10

10

90

10

10

Advisor C

154

20

30

300

30

50

Percentage-based

Within the tier limit, the customer gets the given percentage of the amount.

Example:

Given property

Percentage of the property

Tier 1

0-50

100

Tier 2

51-100

200

Tier 3

101-200

300

 

<Property>
before grace period

Pending point preview before grace period

Bracketed

<Property> at the end of the campaign

Awarded points

Bracketed

Advisor A

49

49*100%

49*100%

79

158

50*100%+29*200%

Advisor B

70

70*200%

50*100%+20*200%

90

180

50*100%+40*200%

Advisor C

154

150*300%

50*100%+50* 200%+54*300%

300

900

50*100%+50*200%+100*300%

 

 

 

 

© Copyright 2022 Antavo Ltd.